大地资源在线观看免费下载,三年片在线观看免费观看大全中国,jk浴室自慰到不停喷水尿失禁,gay成年男人露j网站

自上料攪拌車(chē)廠家直銷(xiāo)

品質(zhì)創(chuàng)造未來(lái),愛(ài)上中科聚峰造

全國(guó)咨詢熱線
400-879-1999
當(dāng)前位置:首頁(yè) »新聞中心 » 常見(jiàn)問(wèn)題混凝土攪拌機(jī)有兩種運(yùn)輸方式你清楚嗎?

混凝土攪拌機(jī)有兩種運(yùn)輸方式你清楚嗎?

來(lái)源:http://www.xiaoplaoshi.cn 瀏覽:0發(fā)表時(shí)間:2020-06-30
  混凝土攪拌機(jī)供給系統(tǒng)是指將石材,沙子,水泥,水等幾種材料堆積和升級(jí)為商品混凝土。 沙子和石頭提升,采用懸臂鏟法,以及裝載機(jī),加上皮帶輸送機(jī)。 用壓縮空氣將水泥吹入散裝水泥筒倉(cāng),并用螺旋輸送機(jī)送入水泥秤。 用于攪拌的水通常由水泵供應(yīng)。
  Concrete mixer supply system refers to the accumulation and upgrading of stone, sand, cement, water and other materials into commercial concrete. Sand and stone lifting, using cantilever shovel method, as well as loader, plus belt conveyor. The cement is blown into the bulk cement silo with compressed air and sent to the cement scale by screw conveyor. The water used for mixing is usually supplied by a pump.
  混凝土攪拌機(jī)總供應(yīng)系統(tǒng)由三部分組成:收集箱,聚合計(jì)量桶和骨料輸送。
  The total supply system of concrete mixer consists of three parts: collecting box, aggregate metering bucket and aggregate conveying.
                                中科攪拌機(jī)
  集料運(yùn)輸:有兩種運(yùn)輸料斗和輸送帶的方式。 料斗輸送的優(yōu)勢(shì)是占地面積小,結(jié)構(gòu)簡(jiǎn)單。 帶式輸送機(jī)具有輸送距離大,效率高,故障率低的優(yōu)勢(shì)。 帶式輸送機(jī)主要適用于帶有集料儲(chǔ)罐的攪拌站,提高了攪拌站的生產(chǎn)率。
  Aggregate transportation: there are two ways to transport hopper and conveyor belt. The advantages of hopper conveying are small floor area and simple structure. Belt conveyor has the advantages of long conveying distance, high efficiency and low failure rate. Belt conveyor is mainly suitable for mixing station with aggregate storage tank, which improves the productivity of mixing station.
  混凝土攪拌機(jī)供應(yīng)系統(tǒng)常見(jiàn)問(wèn)題:
  Common problems of concrete mixer supply system:
  1.料斗偏向或卡住。 這主要是由于兩個(gè)凸起的芯或芯的跳線長(zhǎng)度不一致。 可以通過(guò)調(diào)節(jié)燈芯的長(zhǎng)度,調(diào)節(jié)靈敏度的下限和調(diào)節(jié)防跳裝置來(lái)解決。
  1. The hopper is deflected or jammed. This is mainly due to the inconsistency of the jumper length of two protruding cores or cores. It can be solved by adjusting the length of the wick, adjusting the lower limit of sensitivity and adjusting the anti bounce device.
  2.卸下料斗后,無(wú)法控制跌落。 這主要是由于旅行開(kāi)關(guān)未能修理或更換。
  2. After unloading the hopper, the dropping cannot be controlled. This is mainly due to the failure to repair or replace the travel switch.
  3.絞車(chē)過(guò)熱主要是由于制動(dòng)裝置間隙不當(dāng)造成的。 發(fā)現(xiàn)后立即調(diào)整電機(jī)制動(dòng)器。
  3. The overheating of winch is mainly caused by improper clearance of brake device. Adjust the motor brake immediately after discovery.
  4.配料機(jī)的進(jìn)料門(mén)工作不正常。 主要原因是門(mén)和門(mén)框之間的間隙太大或門(mén)變形。 門(mén)被沙子和礫石擋住了。 糾正材料門(mén)或更換材料門(mén)或橡膠板。
  4. The feeding door of batching machine is not working normally. The main reason is that the gap between the door and the door frame is too large or the door is deformed. The door was blocked by sand and gravel. Correct material door or replace material door or rubber plate.
  5,氣缸力小,需要檢查氣源壓力或修理氣缸。
  5. The cylinder force is small, so it is necessary to check the air supply pressure or repair the cylinder.